Interconnection queue › Nevada

Nevada Interconnection Queue

Snapshot of 2026-08-09 · 104 projects · CAISO

There are 104 projects in the interconnection queue with a Nevada location, totalling 26,986 MW across the 104 that publish a capacity.

Technology in Nevada

Get told what moves in Nevada

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Nevada: what entered, what moved study phase, what came off the list.

Email me Nevada queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO10426,986 MW

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
Solar5311,665 MW
Battery207,245 MW
Geothermal191,509 MW
Natural Gas105,024 MW
Gravity via Rail144 MW
Wind Turbine11,500 MW

Counties in Nevada

9 counties appear in these rows. 2 have enough projects to answer a county-level question and are linked below; the rest are listed with their counts and get no page of their own.

CountyProjectsCapacity
Clark County5518,085 MW
Nye County255,032 MW
Churchill County13552 MWbelow our page threshold
Clark/Nye County31,000 MWbelow our page threshold
Mineral County3239 MWbelow our page threshold
Esmeralda County2627 MWbelow our page threshold
Church County190 MWbelow our page threshold
Lincoln County1960 MWbelow our page threshold
San Benito County1400 MWbelow our page threshold

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
SEARCHLIGHT 1
ID 126
CAISOCLARK1,500WITHDRAWN2006-08-31not published
COYOTE SPRINGS
ID 500
CAISOLINCOLN960WITHDRAWN2009-07-31not published
COPPER RAYS
ID 1344
CAISONYE714WITHDRAWN2016-05-02not published
ARIDA 2 SOLAR FARM
ID 1647
CAISOCLARK700ACTIVE2019-04-15not published
COPPER MOUNTAIN II
ID 237
CAISOCLARK634WITHDRAWN2007-07-02not published
COPPER MOUNTAIN II ALTERNATE
ID 263
CAISOCLARK634WITHDRAWN2007-10-10not published
COPPER MOUNTAIN PROJECT
ID 56
CAISOCLARK634WITHDRAWN2005-01-25not published
SUNVALE SOLAR FARM
ID 1524
CAISOCLARK600WITHDRAWN2018-04-16not published
EL DORADO VALLEY GENERATION
ID 605
CAISOCLARK600WITHDRAWN2010-02-01not published
BIGHORN
ID 145
CAISOCLARK591WITHDRAWN2006-11-08not published
RELIANT ENERGY BIGHORN
ID 71
CAISOCLARK591WITHDRAWN2005-06-15not published
HIDDEN HILLS RANCH
ID 714
CAISONYE540WITHDRAWN2011-03-31not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.