Interconnection queueNevada › Storage

Storage Projects in the Nevada Interconnection Queue

Snapshot of 2026-08-09 · 20 projects

20 storage projects are in the interconnection queue with a Nevada location, totalling 7,245 MW across the 20 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in storage in Nevada

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in storage in Nevada: what entered, what moved study phase, what came off the list.

Email me storage in Nevada queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO207,245 MW

By status, as published

StatusProjects
ACTIVE16
WITHDRAWN4

Top counties

CountyProjectsCapacity
CLARK155,045 MW
NYE31,500 MW
CLARK/NYE2700 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
ARIDA 2 SOLAR FARM
ID 1647
CAISOCLARK700ACTIVE2019-04-15not published
SUNVALE SOLAR FARM
ID 1524
CAISOCLARK600WITHDRAWN2018-04-16not published
SILVER STAR SOLAR
ID 2142
CAISONYE500ACTIVE2021-04-15not published
ROCK VALLEY ENERGY CENTER
ID 2144
CAISONYE500ACTIVE2021-04-15not published
WATER ROCK SOLAR 2
ID 2146
CAISONYE500ACTIVE2021-04-15not published
MOSEY
ID 2148
CAISOCLARK500ACTIVE2021-04-15not published
ARIDA 3 SOLAR FARM
ID 1795
CAISOCLARK450ACTIVE2020-04-15not published
SLOAN ENERGY CENTER
ID 1653
CAISOCLARK448WITHDRAWN2019-04-15not published
BONANZA PEAK SOLAR FARM
ID 1655
CAISOCLARK/NYE400ACTIVE2019-04-12not published
PURPLE SAGE ENERGY CENTER
ID 1800
CAISOCLARK400ACTIVE2020-04-15not published
ARIDA SOLAR FARM
ID 1522
CAISOCLARK370ACTIVE2018-04-16not published
TAHOE
ID 1339
CAISOCLARK300ACTIVE2016-05-02not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.