New Hampshire Interconnection Queue

Snapshot of 2026-08-09 · 138 projects · ISO-NE

There are 138 projects in the interconnection queue with a New Hampshire location, totalling 11,124 MW across the 118 that publish a capacity.

Technology in New Hampshire

Get told what moves in New Hampshire

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in New Hampshire: what entered, what moved study phase, what came off the list.

Email me New Hampshire queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE13811,124 MW (from 118 of 138 projects)

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
SUN491,693 MW
WND23969 MW
WDS15232 MW (from 10 of 15 projects)
N/A104,690 MW (from 5 of 10 projects)
NG71,598 MW
(not published)6not published
WAT613 MW (from 5 of 6 projects)
BAT5948 MW
SUN BAT4353 MW
NUC313 MW (from 2 of 3 projects)
DFO NG20 MW (from 1 of 2 projects)
LFG27 MW
BIT222 MW
JF NG1not published
NG OTH1570 MW

Counties in New Hampshire

14 counties appear in these rows. 3 have enough projects to answer a county-level question and are linked below; the rest are listed with their counts and get no page of their own, and 2 carry a placeholder instead of a location, so we cannot say where those projects are.

CountyProjectsCapacity
Coos County32956 MW (from 23 of 32 projects)
Grafton County273,187 MW
Rockingham County254,626 MW (from 18 of 25 projects)
Cheshire County151,097 MW (from 14 of 15 projects)below our page threshold
Merrimack County9470 MWbelow our page threshold
Sullivan County9154 MWbelow our page threshold
Hillsborough8168 MWbelow our page threshold
Belknap County230 MWbelow our page threshold
Carroll County2195 MWbelow our page threshold
Grafton/Merrimack County266 MWbelow our page threshold
Merrimack/Grafton County2154 MWbelow our page threshold
Strafford County220 MW (from 1 of 2 projects)below our page threshold
N/A1not publishedlocation not published by the ISO
NA1not publishedlocation not published by the ISO

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
1200 MW (+/- 400 kV) HVDC External ETU
ID 1381
ISO-NEGrafton1,200not published4/11/20237/1/2029
HVDC/AC Tie - Import only
ID 519
ISO-NERockingham1,200not published2/16/20154/30/2019
400 kV HVDC Tie - Import Only
ID 627
ISO-NEGrafton1,200not published12/27/201612/31/2022
Northern Pass Transmission Project (300 kV HVDC/AC Tie) - Import Only
ID 499
ISO-NERockingham1,090not published2/16/201512/29/2022
Combined Cycle Capacity Increase/ Generator Change
ID 226
ISO-NERockingham904not published9/5/20076/30/2013
Energy Center
ID 579
ISO-NECheshire570not published11/25/20156/1/2020
Combined Cycle( See # 226)
ID 165
ISO-NERockingham563not published8/3/20066/30/2013
Battery Storage
ID 1364
ISO-NERockingham402not published3/1/202311/20/2026
Battery Storage
ID 1374
ISO-NEMerrimack226not published3/28/20234/7/2027
Battery Storage
ID 1443
ISO-NERockingham200not published9/20/202312/30/2026
Wind
ID 280
ISO-NECoos180not published10/2/20089/1/2011
Solar
ID 1246
ISO-NEGrafton150not published3/31/202211/1/2025

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.