Interconnection queueNew Hampshire › Solar

Solar Projects in the New Hampshire Interconnection Queue

Snapshot of 2026-08-09 · 49 projects

49 solar projects are in the interconnection queue with a New Hampshire location, totalling 1,693 MW across the 49 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in New Hampshire

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in New Hampshire: what entered, what moved study phase, what came off the list.

Email me solar in New Hampshire queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE491,693 MW

By status, as published

StatusProjects
(not published)49

Top counties

CountyProjectsCapacity
Grafton12497 MW
Cheshire10385 MW
Sullivan7126 MW
Coos7230 MW
Rockingham4130 MW
Merrimack3129 MW
Hillsborough236 MW
Belknap230 MW
Carroll1110 MW
Strafford120 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
Solar
ID 1246
ISO-NEGrafton150not published3/31/202211/1/2025
Solar
ID 932
ISO-NECarroll110not published10/22/201910/3/2025
Solar
ID 1428
ISO-NERockingham100not published7/25/202312/30/2028
Solar
ID 587
ISO-NECheshire98not published1/7/20167/1/2018
Solar
ID 615
ISO-NECheshire78not published6/28/20167/1/2018
Solar
ID 1038
ISO-NEMerrimack76not published8/7/202010/31/2025
Solar
ID 599
ISO-NECheshire65not published4/5/20164/18/2018
Solar
ID 1034
ISO-NECoos60not published6/29/202012/30/2023
Solar
ID 1035
ISO-NECoos60not published6/29/202012/30/2023
Solar
ID 897
ISO-NEGrafton60not published7/26/20196/1/2022
Solar
ID 1329
ISO-NEGrafton54not published10/24/20226/5/2024
Solar
ID 948
ISO-NEGrafton51not published1/10/20206/1/2022

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.