Interconnection queueNew Hampshire › Wind

Wind Projects in the New Hampshire Interconnection Queue

Snapshot of 2026-08-09 · 23 projects

23 wind projects are in the interconnection queue with a New Hampshire location, totalling 969 MW across the 23 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in wind in New Hampshire

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in wind in New Hampshire: what entered, what moved study phase, what came off the list.

Email me wind in New Hampshire queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE23969 MW

By status, as published

StatusProjects
(not published)23

Top counties

CountyProjectsCapacity
Coos8487 MW
Grafton5151 MW
Hillsborough588 MW
Grafton/Merrimack266 MW
Merrimack/Grafton2154 MW
Sullivan124 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
Wind
ID 280
ISO-NECoos180not published10/2/20089/1/2011
Wind
ID 176
ISO-NECoos146not published10/20/200612/30/2008
Granite Reliable Power
ID 166
ISO-NECoos94not published8/9/20062/15/2012
Wind
ID 375
ISO-NEMerrimack/Grafton80not published9/7/201112/31/2014
Wind
ID 423
ISO-NEMerrimack/Grafton74not published9/10/201312/31/2016
Wind
ID 305#aaaaa11e
ISO-NEGrafton/Merrimack66not published7/10/200912/31/2012
Spruce Ridge Wind Farm
ID 390
ISO-NEGrafton51not published1/30/201210/31/2017
Wind
ID 255
ISO-NEGrafton50not published3/31/200812/31/2010
Groton Wind Farm
ID 345
ISO-NEGrafton48not published9/8/201012/28/2012
Wind Project
ID 200
ISO-NECoos34not published2/21/200711/1/2014
Wind
ID 371
ISO-NEHillsborough33not published8/1/20117/31/2015
Antrim Wind
ID 543
ISO-NEHillsborough28not published3/2/201512/24/2019

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.