Wind Projects in the New Hampshire Interconnection Queue
Snapshot of 2026-09-07 · 23 projects
23 wind projects are in the interconnection queue with a New Hampshire location, totaling 969 MW across the 23 that publish a capacity.
See what moved in wind in New Hampshire each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in wind in New Hampshire, from new entries to projects that came off the list.
Email me wind in New Hampshire queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 23 | 969 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 23 |
Top counties
| County | Projects | Capacity |
|---|---|---|
| Coos | 8 | 487 MW |
| Grafton | 5 | 151 MW |
| Hillsborough | 5 | 88 MW |
| Grafton/Merrimack | 2 | 66 MW |
| Merrimack/Grafton | 2 | 154 MW |
| Sullivan | 1 | 24 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| Wind | ISO-NE | Coos | 180 | not published | 10/2/2008 | 9/1/2011 |
| Wind | ISO-NE | Coos | 146 | not published | 10/20/2006 | 12/30/2008 |
| Granite Reliable Power | ISO-NE | Coos | 94 | not published | 8/9/2006 | 2/15/2012 |
| Wind | ISO-NE | Merrimack/Grafton | 80 | not published | 9/7/2011 | 12/31/2014 |
| Wind | ISO-NE | Merrimack/Grafton | 74 | not published | 9/10/2013 | 12/31/2016 |
| Wind | ISO-NE | Grafton/Merrimack | 66 | not published | 7/10/2009 | 12/31/2012 |
| Spruce Ridge Wind Farm | ISO-NE | Grafton | 51 | not published | 1/30/2012 | 10/31/2017 |
| Wind | ISO-NE | Grafton | 50 | not published | 3/31/2008 | 12/31/2010 |
| Groton Wind Farm | ISO-NE | Grafton | 48 | not published | 9/8/2010 | 12/28/2012 |
| Wind Project | ISO-NE | Coos | 34 | not published | 2/21/2007 | 11/1/2014 |
| Wind | ISO-NE | Hillsborough | 33 | not published | 8/1/2011 | 7/31/2015 |
| Antrim Wind | ISO-NE | Hillsborough | 28 | not published | 3/2/2015 | 12/24/2019 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.