Interconnection queue › Maine

Maine Interconnection Queue

Snapshot of 2026-08-10 · 407 projects · ISO-NE

There are 407 projects in the interconnection queue with a Maine location, totalling 36,969 MW across the 362 that publish a capacity.

Technology in Maine

Get told what moves in Maine

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Maine: what entered, what moved study phase, what came off the list.

Email me Maine queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE40736,969 MW (from 362 of 407 projects)

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
WND12412,618 MW (from 123 of 124 projects)
SUN1204,768 MW
N/A4516,275 MW (from 28 of 45 projects)
WAT271,085 MW (from 26 of 27 projects)
SUN BAT24740 MW
(not published)2011 MW (from 3 of 20 projects)
BAT11831 MW
NG9296 MW (from 5 of 9 projects)
WDS856 MW (from 5 of 8 projects)
WND BAT8126 MW
WAT BAT316 MW
DFO NG2not published
BLQ WDS232 MW
NG WDS110 MW
KER NG126 MW

Counties in Maine

42 counties appear in these rows. 6 have enough projects to answer a county-level question and are linked below; the rest are listed with their counts and get no page of their own, and 2 carry a placeholder instead of a location, so we cannot say where those projects are.

CountyProjectsCapacity
Penobscot County501,152 MW (from 41 of 50 projects)
Franklin County473,378 MW (from 42 of 47 projects)
Aroostook County409,082 MW (from 36 of 40 projects)
Somerset County402,994 MW (from 38 of 40 projects)
Oxford County36887 MW (from 35 of 36 projects)
York County28707 MW (from 27 of 28 projects)
Androscoggin County231,766 MW (from 21 of 23 projects)below our page threshold
Kennebec County21262 MWbelow our page threshold
Cumberland County201,062 MW (from 14 of 20 projects)below our page threshold
Hancock County16725 MW (from 14 of 16 projects)below our page threshold
Washington County15633 MW (from 14 of 15 projects)below our page threshold
Lincoln County1149 MW (from 7 of 11 projects)below our page threshold
Knox County7166 MWbelow our page threshold
Lewiston County72,401 MWbelow our page threshold
N/A6400 MW (from 2 of 6 projects)location not published by the ISO
Aroostoock County5264 MWbelow our page threshold
Aroostook/Somerset County22,400 MWbelow our page threshold
Penobscot/Washington County2101 MWbelow our page threshold
Sagadahoc County219 MWbelow our page threshold
Somerset and Penobscot County22,400 MWbelow our page threshold
Somerset/Aroostook County22,400 MWbelow our page threshold
Somerset /Lincoln County2not publishedbelow our page threshold
Androscoggin/Franklin County128 MWbelow our page threshold
Cumberland/Kennedbec/Sagadahoc/Lincoln County112 MWbelow our page threshold
Fairfield County120 MWbelow our page threshold
Frqanklin County125 MWbelow our page threshold
Hancock/Aroostook County11,200 MWbelow our page threshold
Howard County15 MWbelow our page threshold
Kennebec/Somerset County121 MWbelow our page threshold
NA112 MWlocation not published by the ISO
Oxford/Androscoggin County152 MWbelow our page threshold
Oxford/Franklin/Androscoggin County128 MWbelow our page threshold
Peneobscot County10 MWbelow our page threshold
Peneobscot/Washington County10 MWbelow our page threshold
Penoboscot County1139 MWbelow our page threshold
Pisataquis County120 MWbelow our page threshold
Piscataquis/Penobscot/Somerset/Waldo/Hancock County158 MWbelow our page threshold
Somerset/Androscoggin County1850 MWbelow our page threshold
Somerset/Kennebec County119 MWbelow our page threshold
Waldo/Sagadahoc County12 MWbelow our page threshold
Wiscasset County11,000 MWbelow our page threshold
York/Oxford/Cumberland County18 MWbelow our page threshold

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
1200 MW non-controllable ETU - N to S flow only
ID 1227
ISO-NESomerset/Aroostook1,200not published2/16/202212/9/2026
1200 MW non-controllable ETU - N to S flow only
ID 1228
ISO-NEHancock/Aroostook1,200not published2/16/202212/9/2026
1200 MW non-controllable ETU - N to S flow only
ID 1230
ISO-NESomerset/Aroostook1,200not published3/4/202212/1/2027
1200 MW non-controllable ETU - N to S flow only
ID 1236
ISO-NEAroostook/Somerset1,200not published3/21/20226/1/2028
1200 MW non-controllable ETU - N to S flow only
ID 1370
ISO-NEAroostook/Somerset1,200not published3/15/20236/1/2028
AC Line from NMISA to Chester and Pittsfield, ME
ID 590
ISO-NESomerset and Penobscot1,200not published1/11/201612/31/2019
NECEC 1200 MW HVDC (import only) - controllable
ID 639
ISO-NEAndroscoggin1,200not published4/19/201712/31/2025
Internal noncontrollable ETU from NMISA to Pittsfield ME
ID 737
ISO-NESomerset and Penobscot1,200not published4/12/201812/31/2021
Pumped Storage Project
ID 270
ISO-NEWiscasset1,000not published7/17/20086/1/2014
Wind
ID 1256
ISO-NEAroostook905not published5/3/202212/9/2026
Wyman Area to Larabee Rd Line
ID 571
ISO-NESomerset/Androscoggin850not published11/2/201511/30/2019
Wind
ID 672
ISO-NEAroostook630not published7/26/201712/31/2022

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-102026-08-10 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.