124 wind projects are in the interconnection queue with a Maine location, totalling 12,618 MW across the 123 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in wind in Maine

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in wind in Maine: what entered, what moved study phase, what came off the list.

Email me wind in Maine queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE12412,618 MW (from 123 of 124 projects)

By status, as published

StatusProjects
(not published)124

Top counties

CountyProjectsCapacity
Aroostook287,414 MW
Franklin241,869 MW (from 23 of 24 projects)
Penobscot15245 MW
Oxford14382 MW
Somerset13975 MW
Washington10467 MW
Hancock7455 MW
Aroostoock3264 MW
Lincoln334 MW
N/A2400 MW
Penobscot/Washington2101 MW
Peneobscot/Washington10 MW
Peneobscot10 MW
NA112 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
Wind
ID 1256
ISO-NEAroostook905not published5/3/202212/9/2026
Wind
ID 672
ISO-NEAroostook630not published7/26/201712/31/2022
Wind
ID 470
ISO-NEAroostook601not published6/19/201412/30/2018
Wind
ID 471
ISO-NEAroostook601not published6/19/201412/30/2019
Wind
ID 734
ISO-NEAroostook601not published4/12/201812/1/2021
Wind
ID 735
ISO-NEAroostook601not published4/12/201812/1/2021
Wind
ID 1210
ISO-NEAroostook500not published1/7/202211/28/2025
Wind
ID 1211
ISO-NEAroostook500not published1/10/202211/27/2026
Wind
ID 626
ISO-NEAroostook376not published12/14/201612/1/2019
Wind Project-Phase 4( MPS Queue # 8)
ID 257
ISO-NEN/A250not published4/14/20089/1/2013
Number Nine Wind Farm
ID 417
ISO-NEAroostook250not published4/25/201310/31/2021
Wind
ID 486
ISO-NEHancock250not published12/19/201412/1/2021

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-102026-08-10 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.