Interconnection queue › Maine › Hybrid
Snapshot of 2026-08-10 · 24 projects
24 hybrid projects are in the interconnection queue with a Maine location, totalling 740 MW across the 24 that publish a capacity.
Get told what moves in hybrid in Maine
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in hybrid in Maine: what entered, what moved study phase, what came off the list.
Email me hybrid in Maine queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 24 | 740 MW |
| Status | Projects |
|---|---|
| (not published) | 24 |
| County | Projects | Capacity |
|---|---|---|
| Kennebec | 7 | 59 MW |
| Oxford | 3 | 136 MW |
| York | 3 | 42 MW |
| Knox | 2 | 5 MW |
| Cumberland | 1 | 5 MW |
| Androscoggin | 1 | 8 MW |
| Howard | 1 | 5 MW |
| Somerset/Kennebec | 1 | 19 MW |
| Oxford/Androscoggin | 1 | 52 MW |
| York/Oxford/Cumberland | 1 | 8 MW |
| Piscataquis/Penobscot/Somerset/Waldo/Hancock | 1 | 58 MW |
| Aroostook | 1 | 205 MW |
| Penoboscot | 1 | 139 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| Solar plus Battery | ISO-NE | Aroostook | 205 | not published | 8/9/2022 | 11/28/2025 |
| Solar and Battery | ISO-NE | Penoboscot | 139 | not published | 4/13/2023 | 12/31/2028 |
| Solar plus Battery | ISO-NE | Oxford | 129 | not published | 3/25/2022 | 12/31/2029 |
| Detroit/Guilford/Belfast DG Area Study | ISO-NE | Piscataquis/Penobscot/Somerset/Waldo/Hancock | 58 | not published | 5/2/2022 | 12/31/2027 |
| Lewiston CMP Cluster 5 | ISO-NE | Oxford/Androscoggin | 52 | not published | 3/28/2022 | 6/30/2028 |
| Sanford/Quaker Hill CMP Cluster 4 | ISO-NE | York | 21 | not published | 3/28/2022 | 6/30/2028 |
| CMP Winslow 115 kV SS - Winslow-Lakewood Areas Study | ISO-NE | Somerset/Kennebec | 19 | not published | 2/4/2021 | 4/30/2024 |
| Augusta E/Puddledock/Bowman St 115 kV SS - Midcoast Area DG Study | ISO-NE | Kennebec | 19 | not published | 12/5/2023 | 12/31/2024 |
| Solar and Battery | ISO-NE | York | 12 | not published | 8/29/2019 | 12/31/2020 |
| Bowman Street 115 kV SS - Augusta Area Study | ISO-NE | Kennebec | 10 | not published | 10/2/2020 | 12/30/2022 |
| Bowman Street 115 kV SS - Augusta Area Study | ISO-NE | Kennebec | 9 | not published | 10/2/2020 | 3/28/2023 |
| Solar and Battery | ISO-NE | York | 9 | not published | 8/29/2019 | 12/31/2020 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-08-10 | 2026-08-10 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.