Interconnection queue › Massachusetts

Massachusetts Interconnection Queue

Snapshot of 2026-08-09 · 605 projects · ISO-NE

There are 605 projects in the interconnection queue with a Massachusetts location, totalling 81,350 MW across the 528 that publish a capacity.

Technology in Massachusetts

Get told what moves in Massachusetts

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Massachusetts: what entered, what moved study phase, what came off the list.

Email me Massachusetts queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE60581,350 MW (from 528 of 605 projects)

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
BAT16323,745 MW
SUN BAT1061,125 MW
SUN65697 MW
DFO NG487,267 MW (from 40 of 48 projects)
WND4720,595 MW
N/A4720,860 MW (from 31 of 47 projects)
NG364,942 MW (from 25 of 36 projects)
(not published)30not published
WAT24258 MW (from 23 of 24 projects)
BIT936 MW (from 5 of 9 projects)
WDS7253 MW
DFO410 MW (from 1 of 4 projects)
LFG43 MW (from 2 of 4 projects)
NUC20 MW (from 1 of 2 projects)
NG WO2379 MW

Counties in Massachusetts

25 counties appear in these rows. 9 have enough projects to answer a county-level question and are linked below; the rest are listed with their counts and get no page of their own, and 2 carry a placeholder instead of a location, so we cannot say where those projects are.

CountyProjectsCapacity
Worcester County1046,210 MW (from 100 of 104 projects)
Hampden County686,307 MW (from 62 of 68 projects)
Bristol County657,799 MW (from 56 of 65 projects)
Middlesex County5910,551 MW (from 48 of 59 projects)
Plymouth County507,056 MW (from 43 of 50 projects)
Berkshire County422,767 MW (from 40 of 42 projects)
Norfolk County383,645 MW (from 32 of 38 projects)
NA3420,926 MW (from 33 of 34 projects)location not published by the ISO
Barnstable County332,445 MW (from 25 of 33 projects)
Franklin County291,231 MW (from 28 of 29 projects)
Suffolk County235,154 MW (from 11 of 23 projects)below our page threshold
Essex County192,420 MW (from 14 of 19 projects)below our page threshold
Hampshire County16532 MWbelow our page threshold
N/A8454 MW (from 6 of 8 projects)location not published by the ISO
Dukes County211 MWbelow our page threshold
Somerset County218 MW (from 1 of 2 projects)below our page threshold
Suffolk/Barnstable County2not publishedbelow our page threshold
Berkshire & Franklin County128 MWbelow our page threshold
Franklin and Berkshire County10 MWbelow our page threshold
Franklin and Bershire County10 MWbelow our page threshold
Franklin/Hampshire County19 MWbelow our page threshold
Hampden/Franklin County18 MWbelow our page threshold
Middlesex/Norfolk County117 MWbelow our page threshold
Middlesex/Worcester County19 MWbelow our page threshold
Wocester County1153 MWbelow our page threshold

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
345 kV AC line
ID 625
ISO-NEBristol1,600not published11/10/201612/31/2023
Offshore wind
ID 1119
ISO-NENA1,320not published4/14/20219/1/2027
Offshore wind
ID 1451
ISO-NENA1,309not published10/5/20239/27/2030
Offshore Wind
ID 1059
ISO-NENA1,200not published9/9/202011/30/2027
SouthCoast Wind 1
ID 1116
ISO-NENA1,200not published4/13/202112/31/2031
Offshore wind
ID 1121
ISO-NENA1,200not published4/19/20215/31/2033
1200 MW DC Transmission Line
ID 1157
ISO-NEnot published1,200not published8/19/20215/31/2028
1200 MW DC Transmission Line
ID 1158
ISO-NEnot published1,200not published8/19/20215/31/2028
Offshore Wind
ID 1225
ISO-NENA1,200not published2/3/20221/31/2029
Offshore Wind
ID 1297
ISO-NENA1,200not published8/15/20225/31/2029
Enable 1200 MW injection at Mystic
ID 1332
ISO-NEnot published1,200not published11/8/202212/30/2029
Offshore Wind
ID 1343
ISO-NENA1,200not published12/19/202212/15/2029

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.