Interconnection queueMassachusetts › Storage

Storage Projects in the Massachusetts Interconnection Queue

Snapshot of 2026-08-09 · 163 projects

163 storage projects are in the interconnection queue with a Massachusetts location, totalling 23,745 MW across the 163 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in storage in Massachusetts

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in storage in Massachusetts: what entered, what moved study phase, what came off the list.

Email me storage in Massachusetts queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE16323,745 MW

By status, as published

StatusProjects
(not published)163

Top counties

CountyProjectsCapacity
Worcester363,680 MW
Bristol264,436 MW
Hampden223,161 MW
Middlesex172,925 MW
Norfolk142,276 MW
Franklin10913 MW
Plymouth9990 MW
Berkshire81,165 MW
Essex71,141 MW
Hampshire5388 MW
Suffolk41,526 MW
Barnstable4993 MW
Wocester1153 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
Battery Storage
ID 1037
ISO-NESuffolk700not published8/4/20206/1/2024
Battery Storage
ID 1426
ISO-NEBristol529not published7/14/20233/31/2028
Battery Storage
ID 1143
ISO-NEMiddlesex508not published6/15/20215/31/2028
Battery Storage
ID 1057
ISO-NEMiddlesex500not published8/28/20206/1/2025
Battery Storage
ID 1543
ISO-NEBarnstable500not published5/28/202412/1/2028
Battery Storage
ID 1567
ISO-NEMiddlesex500not published6/11/20244/27/2028
Battery Storage
ID 1514
ISO-NEWorcester408not published4/8/20248/30/2028
Battery Storage
ID 1517
ISO-NEFranklin366not published4/9/20248/30/2028
Battery Storage
ID 1460
ISO-NEBristol350not published10/12/20239/30/2027
Battery Storage
ID 1252
ISO-NEEssex310not published4/21/20228/1/2032
Battery Storage Increase (QP1238)
ID 1362
ISO-NENorfolk301not published2/24/202311/12/2027
Battery Storage
ID 1363
ISO-NEHampden301not published3/1/202311/20/2026

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.