Rhode Island Interconnection Queue

Snapshot of 2026-08-09 · 123 projects · ISO-NE

There are 123 projects in the interconnection queue with a Rhode Island location, totalling 11,820 MW across the 117 that publish a capacity.

Technology in Rhode Island

Get told what moves in Rhode Island

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Rhode Island: what entered, what moved study phase, what came off the list.

Email me Rhode Island queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE12311,820 MW (from 117 of 123 projects)

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
SUN58687 MW
BAT202,623 MW
NG181,914 MW (from 16 of 18 projects)
WND133,892 MW
DFO NG71,469 MW
LFG534 MW (from 2 of 5 projects)
(not published)1not published
N/A11,200 MW

Counties in Rhode Island

12 counties appear in these rows. 2 have enough projects to answer a county-level question and are linked below; the rest are listed with their counts and get no page of their own, and 2 carry a placeholder instead of a location, so we cannot say where those projects are.

CountyProjectsCapacity
Providence County493,839 MW (from 44 of 49 projects)
Washington County311,900 MW
Kent County16487 MWbelow our page threshold
Newport County91,314 MW (from 8 of 9 projects)below our page threshold
NA52,423 MWlocation not published by the ISO
North Kingstown County5146 MWbelow our page threshold
N/A2450 MWlocation not published by the ISO
Cranston County16 MWbelow our page threshold
Middletown County111 MWbelow our page threshold
N. Smithfield County138 MWbelow our page threshold
Povidence County15 MWbelow our page threshold
Washinton County10 MWbelow our page threshold

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
1200 MW Controllable ETU
ID 1350
ISO-NEnot published1,200not published1/31/202312/31/2029
Offshore Wind
ID 1519
ISO-NENA1,200not published4/12/20244/10/2031
Clear River
ID 489
ISO-NEProvidence1,030not published1/8/20155/31/2022
Combined Cycle
ID 549
ISO-NENewport870not published5/28/20155/1/2020
Revoultion Offshore wind
ID 781
ISO-NENA704not published9/13/201811/5/2026
Wind
ID 325
ISO-NEWashington536not published2/10/201012/31/2015
Wind
ID 260
ISO-NEN/A450not published5/8/200812/31/2013
Battery Storage
ID 1554
ISO-NEProvidence415not published6/7/202410/11/2027
Wind
ID 263
ISO-NEWashington385not published5/27/200812/1/2012
Offshore Wind
ID 782
ISO-NENA352not published9/13/201812/1/2024
Combined Cycle( see # 201)
ID 164
ISO-NEProvidence320not published8/1/20066/1/2012
Battery Storage
ID 1568
ISO-NEWashington313not published6/12/20241/31/2027

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.