Interconnection queueNew York › Gas

Gas Projects in the New York Interconnection Queue

Snapshot of 2026-08-10 · 65 projects

65 gas projects are in the interconnection queue with a New York location, totalling 26,074 MW across the 63 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in gas in New York

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in gas in New York: what entered, what moved study phase, what came off the list.

Email me gas in New York queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
NYISO6324,052 MW (from 61 of 63 projects)
ISO-NE22,022 MW

By status, as published

StatusProjects
Withdrawn61
(not published)2
Cluster Study2

Top counties

CountyProjectsCapacity
Queens102,824 MW
Kings72,085 MW
NY63,624 MW
NY-NJ52,825 MW
Dutchess43,692 MW
Richmond3160 MW (from 2 of 3 projects)
Bronx3754 MW
Suffolk31,405 MW
Nassau3618 MW
Orange2584 MW
Rockland21,525 MW
Niagara2832 MW
Herkimer24 MW
Albany1not published
Sullivan11,080 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
Linden
ID 0226
NYISONY-NJ1,200Withdrawn2006-09-08not published
Liberty Generating Alternative
ID 0668
NYISONY1,171Withdrawn2017-09-15not published
TransGas Energy
ID 0106
NYISOKings1,100Withdrawn2001-10-05not published
Sullivan County Power Project
ID 0023
NYISOSullivan1,080Withdrawn1999-06-25not published
Cricket Valley Project (QP444 in NYISO Queue)
ID 487
ISO-NEDutchess1,020not published12/18/20144/18/2020
Cricket Valley Energy Center
ID 0310
NYISODutchess1,020Withdrawn2008-09-22not published
Combined Cycle (QP310 in NYISO Queue)
ID 277#dc524be2
ISO-NEDutchess1,002not published9/22/20081/31/2018
Liberty Generation
ID 0515
NYISONY1,000Withdrawn2015-10-07not published
Benchmark Generator
ID 0272
NYISOQueens900Withdrawn2007-12-20not published
Linden Power I
ID 0200
NYISONY-NJ845Withdrawn2005-08-16not published
CPV Valley II
ID 0374
NYISOWawayanda820Withdrawn2012-02-21not published
Arthur Kill
ID 0268
NYISONY800Withdrawn2007-12-07not published

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: NYISO last changed 2026-07-16 (6 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
ISO-NE2026-08-102026-08-10 (changed this snapshot)source file
NYISO2026-08-102026-07-16 (unchanged across 6 weekly reads)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.