Interconnection queueCalifornia › Solar

Solar Projects in the California Interconnection Queue

Snapshot of 2026-08-09 · 942 projects

942 solar projects are in the interconnection queue with a California location, totalling 140,018 MW across the 942 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in California: what entered, what moved study phase, what came off the list.

Email me solar in California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO942140,018 MW

By status, as published

StatusProjects
WITHDRAWN750
COMPLETED119
ACTIVE73

Top counties

CountyProjectsCapacity
KERN23636,401 MW
FRESNO14613,057 MW
SAN BERNARDINO8826,326 MW
RIVERSIDE8219,877 MW
KINGS738,602 MW
LOS ANGELES645,774 MW
SAN DIEGO392,144 MW
IMPERIAL378,856 MW
MERCED293,848 MW
TULARE282,944 MW
STANISLAUS181,819 MW
SAN JOAQUIN11805 MW
MADERA10942 MW
SAN LUIS OBISPO91,380 MW
ALAMEDA7448 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
SES SOLAR SIX
ID 110
CAISOSAN BERNARDINO1,400WITHDRAWN2006-06-16not published
SES SOLAR SEVEN
ID 120
CAISOSAN BERNARDINO1,200WITHDRAWN2006-08-09not published
WINGTIP SOLAR 1
ID 1943
CAISOMERCED1,150ACTIVE2021-04-15not published
ALTA 13
ID 451
CAISOSAN BERNARDINO1,150WITHDRAWN2008-05-30not published
CITY OF VERNON RENEWABLE PROJECT 2
ID 505
CAISOKERN1,100WITHDRAWN2009-07-31not published
SUNCREST IMPERIAL SEGS
ID 770
CAISOIMPERIAL1,080WITHDRAWN2011-03-31not published
CENTRAL VALLEY I SEGS
ID 803
CAISOKERN1,080WITHDRAWN2011-03-31not published
HEARTLAND SOLAR
ID 1231
CAISOFRESNO1,043WITHDRAWN2016-05-02not published
HEARTLAND SOLAR-2
ID 1232
CAISOFRESNO1,042WITHDRAWN2016-05-02not published
ATLAS
ID 1468
CAISOFRESNO1,000WITHDRAWN2018-04-16not published
PLUM
ID 1968
CAISOKINGS1,000ACTIVE2021-04-15not published
DESERT OPAL III PV
ID 229
CAISOSAN BERNARDINO1,000WITHDRAWN2007-06-21not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.