Interconnection queueCalifornia › Gas

Gas Projects in the California Interconnection Queue

Snapshot of 2026-08-10 · 235 projects

235 gas projects are in the interconnection queue with a California location, totalling 68,693 MW across the 235 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in gas in California

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in gas in California: what entered, what moved study phase, what came off the list.

Email me gas in California queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
CAISO23568,693 MW

By status, as published

StatusProjects
WITHDRAWN193
COMPLETED36
ACTIVE6

Top counties

CountyProjectsCapacity
SAN DIEGO5510,971 MW
KERN245,098 MW
LOS ANGELES209,263 MW
SAN JOAQUIN195,392 MW
FRESNO162,894 MW
CONTRA COSTA155,668 MW
SAN BERNARDINO135,595 MW
ORANGE114,123 MW
ALAMEDA92,328 MW
RIVERSIDE84,369 MW
KINGS61,492 MW
SOLANO52,716 MW
SUTTER41,870 MW
SAN FRANCISCO3244 MW
MADERA3404 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
ALAMITOS ENERGY CENTER
ID 939
CAISOLOS ANGELES1,903WITHDRAWN2012-04-02not published
MORRO BAY MODERNIZATION PROJECT
ID 9
CAISOSAN LUIS OBISPO1,200WITHDRAWN2000-12-01not published
TESLA POWER PLANT
ID 6
CAISOSAN JOAQUIN1,156WITHDRAWN2000-08-23not published
RIO HONDO POWER
ID 991
CAISOLOS ANGELES1,047WITHDRAWN2013-04-30not published
HUNTINGTON BEACH
ID 893
CAISOORANGE939WITHDRAWN2012-04-02not published
MIRA LOMA HYBRID POWER PROJECT
ID 1085
CAISOSAN BERNARDINO910WITHDRAWN2014-04-30not published
CENTER POWER
ID 990
CAISOLOS ANGELES910WITHDRAWN2013-04-30not published
ENCINA GENERATING PROJECT (PH. 1 AND 2)
ID 5
CAISOSAN DIEGO900WITHDRAWN2000-08-09not published
CPV SENTINEL (FKA INTERGEN OCOTILLO)
ID 3
CAISORIVERSIDE850COMPLETED2000-06-14not published
INLAND EMPIRE ENERGY CENTER
ID 50
CAISORIVERSIDE810COMPLETED2004-12-21not published
VENTURA CLEAN ENERGY
ID 977
CAISOVENTURA778WITHDRAWN2013-04-30not published
SAN DIEGO COMMUNITY POWER GENERATING STATION
ID 8
CAISOSAN DIEGO750WITHDRAWN2000-11-28not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-08-102026-08-10 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.