Interconnection queue › Rhode Island › Washington County › Solar
Solar Projects in Washington County, Rhode Island
Snapshot of 2026-09-07 · 23 projects
23 solar projects are in the interconnection queue in Washington County, Rhode Island, totaling 204 MW across the 23 that publish a capacity.
See what moved in solar in Washington County, Rhode Island each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in solar in Washington County, Rhode Island, from new entries to projects that came off the list.
Email me solar in Washington County, Rhode Island queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 23 | 204 MW |
By fuel code, as published
| Fuel | Projects | Capacity |
|---|---|---|
| SUN | 23 | 204 MW |
By status, as published
| Status | Projects |
|---|---|
| (not published) | 23 |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Wood River Substation - Western RI DER Study #3 | ISO-NE | 49 | not published | 8/19/2024 | 12/31/2026 |
| Wood River - NG WRI DG Area Study #2 >5 MW | ISO-NE | 34 | not published | 8/19/2020 | 6/30/2025 |
| Alton Solar | ISO-NE | 14 | not published | 11/20/2017 | 4/30/2020 |
| Wood River - NG WRI DG Area Study #2 <5 MW | ISO-NE | 10 | not published | 8/19/2020 | 6/30/2025 |
| Solar | ISO-NE | 8 | not published | 8/13/2018 | 7/15/2021 |
| Wood River Substation - NG Western RI DG Area Study | ISO-NE | 8 | not published | 3/18/2020 | 8/15/2021 |
| Chase Hill - NG WRI DG Area Study #2 <5 MW | ISO-NE | 7 | not published | 8/19/2020 | 6/30/2025 |
| Solar | ISO-NE | 7 | not published | 11/20/2017 | 9/1/2020 |
| Tower Hill - NG Western RI DG Area Study | ISO-NE | 7 | not published | 3/18/2020 | 1/15/2023 |
| Chase Hill Substation - NG Western RI DG Area Study | ISO-NE | 7 | not published | 3/18/2020 | 8/15/2021 |
| Wood River - NG Western RI DG Area Study | ISO-NE | 6 | not published | 3/18/2020 | 1/24/2022 |
| Chase Hill Substation - NG Western RI DG Area Study | ISO-NE | 6 | not published | 3/18/2020 | 8/15/2021 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.