Interconnection queue › Nevada › Nye County › Solar
Solar Projects in Nye County, Nevada
Snapshot of 2026-09-07 · 21 projects
21 solar projects are in the interconnection queue in Nye County, Nevada, totaling 3,488 MW across the 21 that publish a capacity.
See what moved in solar in Nye County, Nevada each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in solar in Nye County, Nevada, from new entries to projects that came off the list.
Email me solar in Nye County, Nevada queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 21 | 3,488 MW |
By fuel code, as published
| Fuel | Projects | Capacity |
|---|---|---|
| Solar | 21 | 3,488 MW |
By status, as published
| Status | Projects |
|---|---|
| WITHDRAWN | 17 |
| ACTIVE | 3 |
| COMPLETED | 1 |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| COPPER RAYS | CAISO | 714 | WITHDRAWN | 2016-05-02 | not published |
| HIDDEN HILLS RANCH | CAISO | 540 | WITHDRAWN | 2011-03-31 | not published |
| SANDY VALLEY SOLAR PROJECT | CAISO | 250 | WITHDRAWN | 2012-04-02 | not published |
| DANDELION HYBRID SOLAR | CAISO | 220 | WITHDRAWN | 2021-04-15 | not published |
| PAHRUMP VALLEY SOLAR (FKA LATHROP WELLS 240MW) | CAISO | 210 | WITHDRAWN | 2012-04-02 | not published |
| RE PRISM | CAISO | 205 | WITHDRAWN | 2016-05-02 | not published |
| SOUTH RIDGE | CAISO | 203 | WITHDRAWN | 2016-05-02 | not published |
| ROUGH HAT HYBRID SOLAR | CAISO | 200 | ACTIVE | 2019-04-15 | not published |
| WATER ROCK SOLAR 1 | CAISO | 200 | ACTIVE | 2020-04-15 | not published |
| COPPER RAYS SOLAR | CAISO | 180 | WITHDRAWN | 2012-04-02 | not published |
| SPRING MOUNTAIN SOLAR | CAISO | 100 | WITHDRAWN | 2014-04-30 | not published |
| PAHRUMP SOLAR | CAISO | 86 | WITHDRAWN | 2016-05-02 | not published |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.