Interconnection queue › California › Tulare County › Storage
Storage Projects in Tulare County, California
Snapshot of 2026-09-07 · 16 projects
16 storage projects are in the interconnection queue in Tulare County, California, totaling 3,712 MW across the 16 that publish a capacity.
See what moved in storage in Tulare County, California each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in storage in Tulare County, California, from new entries to projects that came off the list.
Email me storage in Tulare County, California queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| CAISO | 16 | 3,712 MW |
By fuel code, as published
| Fuel | Projects | Capacity |
|---|---|---|
| Battery | 16 | 3,712 MW |
By status, as published
| Status | Projects |
|---|---|
| WITHDRAWN | 11 |
| ACTIVE | 4 |
| COMPLETED | 1 |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| LYCKA SOLAR | CAISO | 460 | WITHDRAWN | 2020-04-15 | not published |
| SOLSKEN | CAISO | 460 | ACTIVE | 2021-04-15 | not published |
| FRAZIER ES | CAISO | 412 | WITHDRAWN | 2015-04-30 | not published |
| SOLAR FARM ENERGY CENTER | CAISO | 400 | WITHDRAWN | 2021-04-15 | not published |
| TRIUMPH SOLAR | CAISO | 300 | WITHDRAWN | 2019-04-15 | not published |
| FOUR CREEKS ENERGY STORAGE | CAISO | 250 | WITHDRAWN | 2021-04-15 | not published |
| BARRENSPRING | CAISO | 240 | WITHDRAWN | 2019-04-15 | not published |
| VESTAL VALLEY | CAISO | 240 | WITHDRAWN | 2019-04-15 | not published |
| REXFORD 2 SOLAR FARM | CAISO | 200 | ACTIVE | 2020-04-15 | not published |
| SEQUOIA | CAISO | 200 | ACTIVE | 2020-04-15 | not published |
| ANDROMEDA | CAISO | 160 | WITHDRAWN | 2021-04-15 | not published |
| BOBOR STORAGE | CAISO | 150 | ACTIVE | 2021-04-15 | not published |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.