Interconnection queue › California › San Luis Obispo County

San Luis Obispo County, California Interconnection Queue

Snapshot of 2026-09-07 · 45 projects · California (CA)

There are 45 projects in the interconnection queue located in San Luis Obispo County, California (CA), totaling 25,358 MW across the 45 that publish a capacity.

Technology in San Luis Obispo County

See what moved in San Luis Obispo County, California each week

The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in San Luis Obispo County, California, from new entries to projects that came off the list.

Email me San Luis Obispo County, California queue changes

Work email only. No newsletter, no obligation.

By ISO

ISOProjectsCapacity
CAISO4525,358 MW

By fuel, as published

Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.

FuelProjectsCapacity
Battery167,654 MW
Wind Turbine1414,264 MW
Solar91,380 MW
Nuclear265 MW
Natural Gas21,245 MW
Water1650 MW
Other1100 MW

By status, as published

StatusProjectsCapacity
WITHDRAWN3623,336 MW
COMPLETED7982 MW
ACTIVE21,040 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOMWStatusQueue dateProposed operation
NIMITZ 1 GENERATION
ID 1589
CAISO1,500WITHDRAWN2019-04-15not published
NIMITZ 2 GENERATION
ID 1590
CAISO1,500WITHDRAWN2019-04-15not published
SEAWOLF GENERATION
ID 1600
CAISO1,500WITHDRAWN2019-04-15not published
ISLAY
ID 1998
CAISO1,500WITHDRAWN2021-04-15not published
VINSON ENERGY
ID 1747
CAISO1,500WITHDRAWN2020-04-15not published
LIGHTHOUSE WIND
ID 1738
CAISO1,400WITHDRAWN2020-04-15not published
BRAVO WIND
ID 2014
CAISO1,400WITHDRAWN2021-04-15not published
MORRO BAY MODERNIZATION PROJECT
ID 9
CAISO1,200WITHDRAWN2000-12-01not published
SALINAN ENERGY
ID 2008
CAISO1,148WITHDRAWN2021-04-15not published
LAS BRISAS OFFSHORE WIND
ID 1588
CAISO1,145WITHDRAWN2019-04-15not published
WESTERN COAST WIND 1
ID 1748
CAISO1,000WITHDRAWN2020-04-15not published
WINDWALKER OFFSHORE
ID 1750
CAISO1,000ACTIVE2020-04-15not published

Where each number came from

ISOWe last readSource last changedSource
CAISO2026-09-072026-09-07 (changed this snapshot)source file

This week's changes · How this is collected

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.