Residential Permit Packet Template
Permit type: residential_other
Placeholders
- {application_number}
- {battery_specs_pdf}
- {city}
- {city_name}
- {contractor_company}
- {contractor_email}
- {contractor_license}
- {contractor_license_copy_pdf}
- {contractor_phone}
- {duct_design_pdf}
- {electrical_form_id}
- {energy_compliance_form_id}
- {equipment_capacity}
- {equipment_model}
- {equipment_specs_pdf}
- {estimated_cost}
- {ev_charger_specs_pdf}
- {job_address}
- {jurisdiction_form_id}
- {jurisdiction_payment_url}
- {jurisdiction_permit_url}
- {legal_description}
- {license_expiration}
- {license_type}
- {load_calculation_pdf}
- {mechanical_form_id}
- {one_line_diagram_pdf}
- {owner_email}
- {owner_mailing_address}
- {owner_name}
- {owner_phone}
- {parcel_number}
- {permit_office_address}
- {permit_type}
- {project_end_date}
- {project_start_date}
- {roc_number}
- {roof_plan_pdf}
- {site_plan_pdf}
- {structural_calculations_pdf}
- {submission_date}
- {wiring_diagram_pdf}
- {work_description}
- {zip_code}
Required attachments
None.
Common rejections
- Review all form fields before submission
- Ensure all required signatures are present
- Double-check contractor license number matches ROC records
- Verify owner information is complete
- Use ACCA-certified software (Wrightsoft, Elite, etc.)
- Include all rooms and conditioned spaces
- Show all inputs (insulation, windows, infiltration)
- Attach software certification printout
- Provide full manufacturer specification sheets
- Include model numbers, serial numbers (if applicable)
- Show efficiency ratings clearly
- Include installation manual excerpts
- Verify license status at azroc.gov before applying
- Ensure license classification matches work type
- Check expiration date
- Include complete copy of license (front and back)
- Show all property lines with dimensions
- Include building footprint and equipment locations
- Label all setback distances
- Add north arrow and scale indicator
- Use professional drafting if possible
- Provide structural calculations from licensed engineer
- Show dead load and live load analysis
- Include wind load calculations (ASCE 7)
- Specify attachment methods and locations
- Reference applicable codes (IECC, NEC, IMC)
- Show compliance with efficiency requirements
- Verify equipment is listed and labeled
- Include energy compliance certificate
- Use official fee schedule from jurisdiction
- Calculate based on declared valuation
- Include all fee components (base, review, inspections)
- Verify total before payment