Level 2 EV Charger Permit Packet Template
Permit type: residential_electrical
Placeholders
- {base_fee}
- {breaker_rating}
- {charger_amperage}
- {charger_load_va}
- {charger_manufacturer}
- {charger_model}
- {charger_voltage}
- {city}
- {code_reference_url}
- {conduit_type}
- {continuous_load_va}
- {contractor_address}
- {contractor_company}
- {contractor_email}
- {contractor_license}
- {contractor_phone}
- {ev_surcharge}
- {existing_load_va}
- {faq_url}
- {inspection_phone}
- {inspection_scheduling_contact}
- {inspection_scheduling_url}
- {installation_location}
- {job_address}
- {jurisdiction_permit_form_url}
- {license_classification}
- {local_code_amendments}
- {low_income_program}
- {mailing_address}
- {number_of_ports}
- {office_hours}
- {online_payment_url}
- {owner_email}
- {owner_name}
- {owner_phone}
- {panel_capacity_va}
- {panel_location}
- {panel_rating}
- {parcel_number}
- {permit_fee}
- {permit_number}
- {permit_office_address}
- {permit_office_email}
- {permit_office_phone}
- {permit_portal_url}
- {plan_review_fee}
- {state}
- {total_fee}
- {total_proposed_load}
- {utility_account_number}
- {utility_provider}
- {wire_gauge}
- {zip_code}
Required attachments
None.
Common rejections
- Review application checklist before submission
- Ensure all required fields are completed
- Obtain all required signatures
- Double-check property address and legal description
- Include detailed load calculation per NEC Article 220
- Show both existing and proposed load
- Have calculation signed by licensed electrician or engineer
- Use approved software or standard worksheet format
- Attach complete specification sheet from manufacturer
- Clearly show UL 2594 listing mark
- Include model number and electrical ratings
- Provide installation manual excerpts
- Show property lines, building, panel, and charger location
- Include conduit route with measurements
- Note installation method (surface/underground)
- Use legible drawing with scale or dimensions
- Verify license is current and active before submission
- Ensure license covers electrical work
- Include license expiration date on application
- Attach copy of license with application
- Use only UL 2594 listed EV chargers
- Verify NEMA rating matches installation location
- Document outdoor rating if applicable (NEMA 3R minimum)
- Avoid uncertified or imported equipment without NRTL mark
- Follow NEC Table 310.16 for wire sizing
- Account for continuous load (125% factor)
- Consider voltage drop for long runs (>100 feet)
- Use copper wire minimum #6 AWG for 40A, #4 AWG for 50A