Interconnection queue › Pennsylvania

Pennsylvania Interconnection Queue

Snapshot of 2026-08-10 · 28 projects · NYISO

There are 28 projects in the interconnection queue with a Pennsylvania location, totalling 7,664 MW across the 27 that publish a capacity.

Get told what moves in Pennsylvania

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in Pennsylvania: what entered, what moved study phase, what came off the list.

Email me Pennsylvania queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
NYISO287,664 MW (from 27 of 28 projects)

By fuel, as published

Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.

FuelProjectsCapacity
S71,819 MW
W71,210 MW
ES61,790 MW
CR41,300 MW
CC31,545 MW
AC1not published

Counties in Pennsylvania

10 counties appear in these rows. 0 have enough projects to answer a county-level question and are linked below; the rest are listed with their counts and get no page of their own.

CountyProjectsCapacity
Clearfield County72,099 MWbelow our page threshold
McKean County51,470 MWbelow our page threshold
Clinton County3995 MW (from 2 of 3 projects)below our page threshold
Mckean County31,000 MWbelow our page threshold
Tioga County3770 MWbelow our page threshold
Bradford County2250 MWbelow our page threshold
Tioga - Bradford County2270 MWbelow our page threshold
Clinton County1120 MWbelow our page threshold
Elk County1290 MWbelow our page threshold
Jefferson County1400 MWbelow our page threshold

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
Tioga County Power
ID 0498
NYISOTioga550Withdrawn2015-04-29not published
Renovo Energy Center Uprate
ID 0693
NYISOClinton515Withdrawn2018-02-13not published
Renovo Energy Center
ID 0496
NYISOClinton480Withdrawn2015-04-13not published
Mineral Basin Solar Power
ID 1080
NYISOClearfield402Active2020-08-2112-2029
PA-Hockenberry
ID 1584
NYISOJefferson400Withdrawn2023-07-28not published
Shallow Seam BESS
ID 1632
NYISOClearfield400Withdrawn2023-11-08not published
Black Cherry Battery
ID 1649
NYISOMckean County400Withdrawn2023-12-05not published
Shallow Seam BESS
ID C24-233
NYISOClearfield400Cluster Study2024-09-2203-2029
McKean County Solar CSR Phase 1
ID 1325
NYISOMcKean325Withdrawn2022-01-20not published
McKean County Solar CSR Phase 2
ID 1326
NYISOMcKean325Withdrawn2022-01-20not published
Stargazer I
ID C24-175
NYISOMcKean325Cluster Study2024-09-1707-2029
Stargazer II
ID C24-176
NYISOMcKean325Cluster Study2024-09-1707-2029

Where each number came from

Read this before quoting a figure. We re-read every source every week, but a weekly read of an unchanged file is not weekly data. These have not moved in a while: NYISO last changed 2026-07-16 (6 identical reads since). Those rows are exactly as current as the ISO's own published file, and no more.
ISOWe last readSource last changedSource
NYISO2026-08-102026-07-16 (unchanged across 6 weekly reads)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.