Interconnection queue › New Mexico
Snapshot of 2026-08-09 · 57 projects · SPP, CAISO
There are 57 projects in the interconnection queue with a New Mexico location, totalling 10,784 MW across the 57 that publish a capacity.
Get told what moves in New Mexico
The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in New Mexico: what entered, what moved study phase, what came off the list.
Email me New Mexico queue changes →Work email only. No newsletter, no obligation.
Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.
| ISO | Projects | Capacity |
|---|---|---|
| SPP | 56 | 9,084 MW |
| CAISO | 1 | 1,700 MW |
Shown in each ISO's own coding — a state served by more than one ISO will show more than one spelling of the same technology, and we do not silently merge them here.
| Fuel | Projects | Capacity |
|---|---|---|
| (not published) | 32 | 2,574 MW |
| Solar/Storage | 9 | 2,911 MW |
| Gas | 6 | 1,049 MW |
| Photovoltaic | 2 | 525 MW |
| Battery | 2 | 190 MW |
| Wind | 2 | 650 MW |
| Wind Turbine | 1 | 1,700 MW |
| Combined Cycle | 1 | 1,003 MW |
| CT | 1 | 23 MW |
| Combustion Turbine | 1 | 160 MW |
23 counties appear in these rows. 0 have enough projects to answer a county-level question and are linked below; the rest are listed with their counts and get no page of their own.
| County | Projects | Capacity | |
|---|---|---|---|
| Roosevelt County | 10 | 2,672 MW | |
| Lea County | 7 | 1,404 MW | |
| Chaves County | 5 | 470 MW | |
| Lovington County | 5 | 514 MW | |
| Lea County | 4 | 334 MW | |
| Hobbs County | 3 | 249 MW | |
| Roswell County | 3 | 450 MW | |
| Bloomfield County | 2 | 120 MW | |
| Eddy County | 2 | 135 MW | |
| Kirtland County | 2 | 240 MW | |
| Quay County | 2 | 103 MW | |
| Chaves County | 1 | 300 MW | |
| Chaves County (Melrose) County | 1 | 120 MW | |
| Curry County | 1 | 2 MW | |
| Elida County | 1 | 120 MW | |
| Gaines County | 1 | 1,003 MW | |
| Grady County | 1 | 18 MW | |
| La Plata County | 1 | 85 MW | |
| Lincoln County | 1 | 1,700 MW | |
| Portales County | 1 | 256 MW | |
| Quay County | 1 | 25 MW | |
| Rogers County | 1 | 104 MW | |
| San Juan County | 1 | 360 MW |
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | County | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|---|
| COWBOY MESA WIND | CAISO | LINCOLN | 1,700 | WITHDRAWN | 2011-03-31 | not published |
| GEN-2020-065 | SPP | Gaines | 1,003 | IA FULLY EXECUTED/ON SCHEDULE | 4/30/2020 | 7/2/2028 |
| GEN-2006-026 | SPP | Lea | 604 | IA FULLY EXECUTED/COMMERCIAL OPERATION | 7/26/2006 | 6/1/2008 |
| GEN-2024-303 | SPP | Roosevelt | 500 | DISIS STAGE | 3/1/2025 | 12/31/2029 |
| GEN-2024-304 | SPP | Roosevelt | 500 | DISIS STAGE | 3/1/2025 | 12/31/2029 |
| ERAS-2025-020 | SPP | Lovington | 400 | ERAS | 10/2/2025 | 10/1/2030 |
| GEN-2024-221 | SPP | Roosevelt | 400 | DISIS STAGE | 3/1/2025 | 6/28/2030 |
| 2018-G6 | SPP | San Juan County | 360 | IA PENDING | 9/10/2018 | not published |
| ERAS-2025-030 | SPP | Roswell | 350 | ERAS | 10/2/2025 | 10/1/2030 |
| GEN-2024-159 | SPP | Roosevelt | 300 | DISIS STAGE | 3/1/2025 | 12/31/2029 |
| GEN-2008-022 | SPP | Chaves County | 300 | IA FULLY EXECUTED/COMMERCIAL OPERATION | 3/28/2008 | 11/15/2015 |
| IFS-2016-002-27 | SPP | Roosevelt | 298 | IA FULLY EXECUTED/COMMERCIAL OPERATION | 11/30/2016 | 12/31/2020 |
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| CAISO | 2026-08-09 | 2026-08-09 | source file |
| SPP | 2026-08-09 | 2026-08-09 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.