Interconnection queueConnecticut › Solar

Solar Projects in the Connecticut Interconnection Queue

Snapshot of 2026-08-09 · 56 projects

56 solar projects are in the interconnection queue with a Connecticut location, totalling 1,487 MW across the 56 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in solar in Connecticut

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in solar in Connecticut: what entered, what moved study phase, what came off the list.

Email me solar in Connecticut queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE561,487 MW

By status, as published

StatusProjects
(not published)56

Top counties

CountyProjectsCapacity
Hartford25992 MW
Windham11259 MW
New London7111 MW
New Haven440 MW
Litchfield344 MW
Tolland328 MW
Fairfield15 MW
Ellington16 MW
Putnam12 MW

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
Solar
ID 1245
ISO-NEHartford150not published3/31/202210/31/2028
Solar
ID 1061
ISO-NEHartford135not published9/10/202010/31/2022
Solar
ID 1156
ISO-NEHartford101not published8/16/202110/15/2024
Broadleaf Solar
ID 1192
ISO-NEHartford101not published11/4/202110/15/2027
Solar
ID 1155
ISO-NEHartford101not published8/16/202110/15/2024
Solar
ID 613
ISO-NEWindham63not published6/28/20167/1/2018
Husky Solar
ID 1138
ISO-NEWindham50not published6/3/20215/10/2030
Solar
ID 796
ISO-NEHartford50not published10/26/201811/1/2022
Gravel Pit Solar
ID 892
ISO-NEHartford50not published6/12/20198/13/2025
Quinebaug Solar
ID 588
ISO-NEWindham49not published1/7/201612/18/2021
Gravel Pit Solar Increase
ID 1030
ISO-NEHartford45not published6/2/20208/13/2025
Solar
ID 713
ISO-NEHartford26not published2/21/201812/10/2019

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.