Gas Projects in the Connecticut Interconnection Queue

Snapshot of 2026-08-09 · 61 projects

61 gas projects are in the interconnection queue with a Connecticut location, totalling 3,516 MW across the 44 that publish a capacity.

Grouped from the ISOs' own fuel codes — see the mapping. Codes we could not match to a published definition are left unclassified rather than assigned here.

Get told what moves in gas in Connecticut

The ISOs publish today's queue and overwrite it — no archive, no history. We keep a weekly copy. Leave your email and we'll send you what changed in gas in Connecticut: what entered, what moved study phase, what came off the list.

Email me gas in Connecticut queue changes →

Work email only. No newsletter, no obligation.

Prefer to just buy it? See the queue sentinel, priced, with last week's changes as a free sample.

By ISO

ISOProjectsCapacity
ISO-NE613,516 MW (from 44 of 61 projects)

By status, as published

StatusProjects
(not published)61

Top counties

CountyProjectsCapacity
Fairfield222,270 MW (from 16 of 22 projects)
New Haven19430 MW (from 13 of 19 projects)
Windham5506 MW
Hartford554 MW
New London4253 MW
Litchfield34 MW (from 1 of 3 projects)
Tolland1not published
Middlesex1not published
(not published)1not published

Largest projects with published capacity

The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.

ProjectISOCountyMWStatusQueue dateProposed operation
Combined Cycle
ID 369
ISO-NEFairfield745not published6/8/20116/1/2016
Combined Cycle
ID 388
ISO-NEFairfield680not published1/13/20125/31/2016
Gas Turbine
ID 159
ISO-NEFairfield325not published6/30/20069/30/2010
Combined Cycle
ID 202
ISO-NEWindham250not published2/27/20075/31/2013
Gas Turbine
ID 1393
ISO-NEFairfield233not published5/3/20236/1/2026
Combined Cycle
ID 161#c721d11a
ISO-NENew London223not published7/5/20065/31/2013
Combined Cycle Capacity Increase (See QP #202)
ID 225
ISO-NEWindham161not published8/13/20075/31/2013
Combustion Turbine
ID 611
ISO-NEFairfield102not published4/25/20166/1/2019
Wallingford Energy Center
ID 440
ISO-NENew Haven100not published2/24/20145/9/2018
Waterbury Generating Facility
ID 199
ISO-NENew Haven96not published2/21/20076/26/2009
Bridgeport Energy Uprate
ID 469
ISO-NEFairfield84not published6/16/20146/5/2015
Beacon Falls Energy Park
ID 497
ISO-NENew Haven63not published2/13/20154/1/2022

Where each number came from

ISOWe last readSource last changedSource
ISO-NE2026-08-092026-08-09 (changed this snapshot)source file

Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.

Interconnection queue home · This week's changes · How this is collected · US Tech Automations.