Interconnection queue › Connecticut › New Haven County
New Haven County, Connecticut Interconnection Queue
Snapshot of 2026-09-07 · 65 projects · Connecticut (CT)
There are 65 projects in the interconnection queue located in New Haven County, Connecticut (CT), totaling 4,897 MW across the 45 that publish a capacity.
Technology in New Haven County
See what moved in New Haven County, Connecticut each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in New Haven County, Connecticut, from new entries to projects that came off the list.
Email me New Haven County, Connecticut queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 65 | 4,897 MW |
By fuel, as published
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| NG | 19 | 430 MW |
| BAT | 14 | 2,108 MW |
| DFO NG | 10 | 1,975 MW |
| (not published) | 9 | not published |
| SUN | 4 | 40 MW |
| WAT | 2 | 6 MW |
| N/A | 1 | not published |
| JF KER | 1 | not published |
| KER NG | 1 | 197 MW |
| DFO KER | 1 | 78 MW |
| DFO KER NG | 1 | 39 MW |
| DFO | 1 | 24 MW |
| FC | 1 | 0 MW |
By status, as published
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 65 | 4,897 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| CPV Towantic Energy Center | ISO-NE | 745 | not published | 12/29/2011 | 5/21/2018 |
| Meriden Gas Turbines | ISO-NE | 510 | not published | 7/16/2007 | 6/1/2015 |
| Towantic Energy | ISO-NE | 452 | not published | 4/3/2007 | 12/31/2014 |
| Battery Storage | ISO-NE | 326 | not published | 3/29/2023 | 4/1/2027 |
| Battery Storage | ISO-NE | 300 | not published | 1/2/2024 | 6/30/2027 |
| Battery Storage | ISO-NE | 263 | not published | 2/6/2023 | 10/1/2027 |
| Naugatuck Avenue Battery Storage | ISO-NE | 205 | not published | 1/8/2021 | 10/31/2028 |
| Battery Storage | ISO-NE | 200 | not published | 4/24/2020 | 10/1/2026 |
| Devon Units 15, 16, 17, 18 | ISO-NE | 197 | not published | 7/5/2006 | 6/9/2010 |
| Battery Storage | ISO-NE | 160 | not published | 12/30/2021 | 12/31/2024 |
| Battery Storage | ISO-NE | 136 | not published | 2/6/2023 | 10/1/2027 |
| Battery Storage | ISO-NE | 135 | not published | 12/12/2023 | 1/31/2027 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.