Interconnection queue › Connecticut › Hartford County
Hartford County, Connecticut Interconnection Queue
Snapshot of 2026-09-07 · 57 projects · Connecticut (CT)
There are 57 projects in the interconnection queue located in Hartford County, Connecticut (CT), totaling 3,025 MW across the 53 that publish a capacity.
Technology in Hartford County
See what moved in Hartford County, Connecticut each week
The ISOs publish today's queue and overwrite it, so no archive exists. We keep a weekly copy. Leave your email and we'll send you each week's changes in Hartford County, Connecticut, from new entries to projects that came off the list.
Email me Hartford County, Connecticut queue changesWork email only. No newsletter, no obligation.
By ISO
| ISO | Projects | Capacity |
|---|---|---|
| ISO-NE | 57 | 3,025 MW |
By fuel, as published
Shown in each ISO's own coding. We do not merge two operators' spellings of the same technology here. The national table is the only place any fuel code is mapped.
| Fuel | Projects | Capacity |
|---|---|---|
| SUN | 25 | 992 MW |
| BAT | 14 | 1,832 MW |
| NG | 5 | 54 MW |
| DFO NG | 3 | 0 MW |
| FC | 3 | 17 MW |
| SUN BAT | 3 | 125 MW |
| (not published) | 2 | not published |
| MSW | 2 | 4 MW |
By status, as published
| Status | Projects | Capacity |
|---|---|---|
| (not published) | 57 | 3,025 MW |
Largest projects with published capacity
The 12 highest-capacity rows in this page's exact scope, ordered by the capacity the ISO published. Projects without a published capacity are not ranked here and remain included in the totals above.
| Project | ISO | MW | Status | Queue date | Proposed operation |
|---|---|---|---|---|---|
| Battery Storage | ISO-NE | 326 | not published | 7/7/2023 | 2/2/2029 |
| Battery Storage | ISO-NE | 238 | not published | 12/12/2023 | 1/31/2027 |
| Battery Storage | ISO-NE | 238 | not published | 5/6/2024 | 1/31/2027 |
| Battery Storage | ISO-NE | 196 | not published | 1/12/2023 | 9/15/2026 |
| Battery Storage | ISO-NE | 167 | not published | 4/1/2024 | 4/1/2028 |
| Solar | ISO-NE | 150 | not published | 3/31/2022 | 10/31/2028 |
| Solar | ISO-NE | 135 | not published | 9/10/2020 | 10/31/2022 |
| Battery Storage | ISO-NE | 133 | not published | 6/4/2024 | 4/1/2028 |
| Battery Storage | ISO-NE | 125 | not published | 8/10/2022 | 4/1/2027 |
| Battery Storage | ISO-NE | 102 | not published | 5/18/2023 | 12/31/2026 |
| Solar | ISO-NE | 101 | not published | 8/16/2021 | 10/15/2024 |
| Broadleaf Solar | ISO-NE | 101 | not published | 11/4/2021 | 10/15/2027 |
Where each number came from
| ISO | We last read | Source last changed | Source |
|---|---|---|---|
| ISO-NE | 2026-09-07 | 2026-09-07 | source file |
Compiled from each ISO's own published interconnection queue report. Queue position is not a permit, a contract, or a guarantee that a project will be built; most projects in every queue are eventually withdrawn. Figures are reproduced as published, are provided for informational purposes only, and carry no warranty of accuracy or completeness. Always verify against the ISO's own report before relying on any figure.